Plumbing Connections

Transnet

Type

Plumbing Connections

Location

Gauteng

Year

Completed

Overview

MC & CHK Holdings carried out plumbing connection works for Transnet, supporting the reliability of the client's facility infrastructure.

Scope of works

  • —Installation of new plumbing connections
  • —Tie-ins to existing water infrastructure
  • —Testing and commissioning of completed connections

Challenges

Works were delivered within an operational environment, requiring coordination with the client to limit disruption to ongoing activities.

Our Role

MC & CHK delivered the plumbing works package, supplying labour, materials and supervision on site.

Outcome

All connections were completed, tested and handed over to the client.

Site crew installing large pipeline sections in an open trench

Site record

Photography from site

Progress and completion photography captured by the MC & CHK team on site.

Site crew backfilling around a large welded steel pipeline in an open trench
01Pipeline installation in trench
Long yellow-sleeved pipeline section positioned in an excavated trench with plant on standby
02Pipe section positioned
Team completing a pipeline joint connection within a shored excavation
03Joint connection works
Worker connecting PVC plumbing pipes in an open trench on site
04PVC connections and tie-ins