MC & CHK Holdings
All projects

Mechanical Repairs

Department of Health — Booster Pump Repair

Type

Mechanical Repairs

Location

Gauteng

Year

Completed

Overview

MC & CHK Holdings repaired a booster pump installation for the Department of Health, restoring dependable water pressure to the facility's distribution system.

Scope of works

  • —Fault diagnosis on the booster pump system
  • —Repair and replacement of failed components
  • —Pressure testing and recommissioning

Challenges

The repair was prioritised to minimise the period of reduced water pressure at an active health facility.

Our Role

MC & CHK supplied the mechanical repair team and managed the works from diagnosis through to recommissioning.

Outcome

The booster pump was repaired and returned to full service.

Industrial booster pump and hose assembly ready for repair and commissioning
Completed commercial building at dusk

Start a project

Let's build something
that lasts.

Have a construction project, development or requirement? Talk to the MC & CHK team.