All projects
Mechanical Repairs
Department of Health — Booster Pump Repair
Type
Mechanical Repairs
Location
Gauteng
Year
Completed
Overview
MC & CHK Holdings repaired a booster pump installation for the Department of Health, restoring dependable water pressure to the facility's distribution system.
Scope of works
- —Fault diagnosis on the booster pump system
- —Repair and replacement of failed components
- —Pressure testing and recommissioning
Challenges
The repair was prioritised to minimise the period of reduced water pressure at an active health facility.
Our Role
MC & CHK supplied the mechanical repair team and managed the works from diagnosis through to recommissioning.
Outcome
The booster pump was repaired and returned to full service.


Start a project
Let's build something
that lasts.
Have a construction project, development or requirement? Talk to the MC & CHK team.
